organization structure
project |
total installed capacity (10,000 kilowatts) |
shareholding ratio (100%) |
installed capacity on an equity basis (10,000 kilowatts) |
yangshupu power plant |
0.00 |
100.00% |
0.00 |
qujing thermal power plant |
60.00 |
100.00% |
60.00 |
minghang power plant |
0.00 |
100.00% |
0.00 |
waigaoqiao power |
128.00 |
51.00% |
65.28 |
waigaoqiao ii power |
180.00 |
20.00% |
36.00 |
waigaoqiao iii power |
200.00 |
30.00% |
60.00 |
wujing power |
60.00 |
50.00% |
30.00 |
wujing ii power |
120.00 |
49.00% |
58.80 |
caojing thermal power |
65.80 |
36.00% |
23.69 |
coal power |
126.00 |
50.00% |
63.00 |
kanshan power |
120.00 |
55.00% |
66.00 |
wangting gas turbine power |
78.00 |
45.00% |
35.10 |
zhenhai gas turbine power |
78.92 |
37.50% |
29.60 |
jiangsu baling |
3.00 |
15.00% |
0.45 |
tiantai |
1.09 |
51.00% |
0.56 |
shanghai electric power-caojing power |
200.00 |
65.00% |
130.00 |
lingang gas turbine power |
164.60 |
35.00% |
57.61 |
suqian solar power |
0.89 |
51.00% |
0.45 |
total |
0.45 |
- |
716.53 |